Project data

  • Customer
  • Accenture
  • Value
  • Undisclosed
  • Area
  • 4,000 sq ft
  • Programme duration
  • 10 weeks
  • Completion date
  • March 2009
  • Project Manager
  • HOK
  • M&E Engineer
  • CD Engineering

Overview

As design & build contractor ISG was responsible for the complete construction works and delivery of the entire project under this contractual route.

Key challenges included the LEED certification process within stringent timelines to ensure works were procured in line with the construction programme, whilst maintaining control of the budget at all times; logistical constraints of installing M&E infrastructure spanning Levels 1 to 13 (and roof); integrated systems testing; and exceptionally high acoustic performance criteria and client migrations. ISG worked closely with the consultant team throughout the procurement process and was responsible for the preparation of tender documentation, the tendering process, and the recommendation and award of individual packages.